Installation Service

End-to-end installation service for UPS, power quality devices, ATS/STS, and monitoring systems. Our focus is fast commissioning, clean wiring, and reliable operation from day one.

Typical Duration

2-14 working days depending on project scope

Team Composition

Engineer + Technician + Supervisor

Output

Commissioning report & handover docs

Scope of Work

  • Site survey, load mapping, and existing panel verification
  • Power and control wiring based on approved drawings and safety standards
  • Device parameter setup based on site requirements
  • Integrated testing to ensure interlock performance
  • Commissioning sign-off with the user team

Deliverables

  • As-built installation checklist
  • Commissioning report (measurements and test results)
  • Basic daily operational SOP
  • Short technical training for site operators
  • Preventive action recommendations after startup

Service Packages

Basic Install

Installation and basic testing for a single area/site.

Standard Commissioning

Installation, integrated testing, and commissioning report.

Extended Deployment

Multisite execution, shift work, and complete documentation handover.

Quick FAQ

Can installation be done at night or on holidays?

Yes, with a dedicated schedule to minimize operational disruption.

Does it include material supply?

It can be material-inclusive or service-only, depending on agreed scope.

Is support available after commissioning?

Yes, through a support period defined in the proposal.

Need an Installation Service Proposal?

Send your site data and requirements, and our team will prepare an execution plan with timeline estimates.